Sample Projects

 

 

Lean Plant Layout For New Facility

 

 

PROBLEM:

  • Customer wanted to build a new facility to reduce cost, improve flow, reduce in-process inventory, and reduce cycle time.
  • Existing facility was in several buildings and the WIP was excessive.

SOLUTION:

  • Developed flow models of entire facility.
  • Established product lines.
  • Developed a Lean line-flow fabrication and assembly process.
  • Developed layout in AutoCAD.

BENEFITS:

  • Major improvements in flow.
  • Reduced facility size from 235,000 ft2 to 188,000 ft2
  • Material handling requirements dropped dramatically
  • Plant is currently under construction

The Lean Manufacturing plant layout is shown below. The black lines represent raw material flow, red represents fabrication, yellow represents subassembly flow, silver represents the painting process, and blue represents final product assembly. This layout represents a major reduction in labor spent handling materials.

Lean manufactruing, flow diagram, igraphix